
Documents
This is where you can find all project documentation, ordered from most recent to least.
Phase Two (Statutory) Consultation Documents
-
-
CHAPTERS
Lostrigg Solar Non – Technical Summary
PEIR Chapter 0 - Contents, Glossary and Acronyms
Chapter 1 – 4 Introductory chapters
Chapter 5 - Agricultural land and soils
Chapter 9 - Landscape and Visual
Chapter 10 - Noise and Vibration
Chapter 12 - Water resources and flood risk
Chapter 13 - Cumulative effects assessment and summary
APPENDICES
Appendix A-3 Scoping Opinion response matrix
Appendix A-4 Agricultural land classification report
Appendix A-5 Habitat Survey Report
Appendix A-6 Bat survey report
Appendix A-7 Breeding Bird Survey Report
Appendix A-10 Great Crested Newt eDNA Report
Appendix A-11 Invertebrate survey report
Appendix A-12 Habitat Regulations Assessment stage 1
Appendix A-13 Arboricultural impact assessment
Appendix A-14 Climate change Supporting Information
Appendix A-15 Geophysical survey report
Appendix A-16 LVIA Methodology
Appendix A-17 Landscape baseline and effects
Appendix A-18 Visual baseline and effects
Appendix A-19 Legislation, policy and guidance
Appendix A-19a Workington Solar Farm, Landscape and Visual Appraisal
Appendix A-20 Policy Legislation and Guidance
Appendix A-21 Noise monitoring data
Appendix A-22 Flood risk assessment
Appendix A-23 Drainage strategy
Appendix A-24 WFD / WER compliance assessment
Appendix A-25 Long and Short List of Committed Developments
Appendix A-26 In-combination effects Table
Appendix B-1 Transport statement
Appendix B-2 Coal mining risk assessment
Appendix B-3 Construction dust assessment
Appendix C-1 Outline Construction Environmental Management Plan
Appendix C-2 Outline Construction Traffic Management Plan
Appendix C-3 Outline Soil Resources Management Plan
Appendix C-4 Outline Battery Fire Safety Management Plan
Appendix C-5 Outline Landscape and Ecological Management Plan
Appendix C-6 Outline Public Rights of Way Management Plan
Appendix C-7 Outline Decommissioning Environmental Management Plan
FIGURES
Figure 1.2 Layout of Proposed Development
Figure 2.1 Preliminary design of Northern Panel Area
Figure 2.2 Preliminary design of Central Panel Area
Figure 2.3 Preliminary design of Southern Panel Area
Figure 2.4 Outline Environmental Masterplan
Figure 2.5 Key environmental designations
Figure 2.6 Typical fixed solar panel
Figure 2.7 Typical hybrid pack
Figure 2.8 Typical customer switchgear
Figure 2.10 Typical pylon and PoC mast
Figure 5.1 Provisional Agricultural Land Classification
Figure 5.3 Agricultural land classification survey - Panel Areas
Figure 6.2 Statutory designated sites
Figure 6.3 Non-statutory designated site
Figure 6.4 Waterbody location plan
Figure 6.5 Provisional habitat plan
Figure 6.6 Provisional priority habitat map
Figure 6.7 Invasive species location plan
Figure 8.1 Designated Heritage Assets
Figure 8.2 Non-designated Heritage Assets
Figure 9.1 Site location, study area and search area
Figure 9.2 Topography and Hydrology
Figure 9.3 Landcover and vegetation patterns
Figure 9.4 Tranquillity baseline
Figure 9.5 Landscape designations
Figure 9.6 Landscape Receptors
Figure 9.7 Representative viewpoint and Zone of Theoretical Visibility
Figure 9.8 Photosheets and visualisations Part 1
Figure 9.8 Photosheets and visualisations Part 2
Figure 10.1 Sensitive receptor plan
Figure 10.2 Noise monitoring location plan
Figure 10.3 Solar Panel Construction noise buffer plan
Figure 10.4 Cable route construction noise buffer
Figure 10.5 Operational noise contours
Figure 11.3 Public Rights of Way
Figure 11.4 Community and Recreational Facilities
Figure 12.1 Surface water features
Figure 12.2 Bedrock geology sheet 1
Figure 12.2 Bedrock geology sheet 2
Figure 12.3 Superficial geology sheet 1
Figure 12.3 Superficial geology sheet 2
Figure 12.4 Groundwater designations
Figure 12.5 Licensed abstractions
Figure 12.6 Risk of flooding from surface water
Figure 12.7 Risk of flooding from Rivers and Sea
Figure 12.8 Flooding from groundwater
Figure 12.10 Water receptor surface status
Figure 13.1 Long list committed developments
Please click each item to view all DCO and PEIR documents
Programme Document
Statement of Community Consultation (SoCC)
Phase One Consultation Summary Report (CSR)
Phase One (Non-Statutory) Consultation Materials
General Project Information
EIA Scoping Report
Figures
Environmental Impact Assessment Scoping Report Figures (1- 25)
Environmental Impact Assessment Scoping Report Figures (26- 47)
Appendices